Queues, scheduling and variability in operations
Four requests take the same total work in two different mornings. In one case they arrive just when the server becomes free. In the other they arrive in pairs. Total work is unchanged, yet some people wait. A daily average arrival count has hidden the timing that creates the queue.
Use engineering measurement and design methods for evidence, requirements and comparisons. This chapter introduces its own rates, count balances and inequalities. All operations, times, outputs and scores are original constructed cases; no reported business or personnel performance is implied.
Back to the chapterAfter reading, you can
Reconstruct a small queue and compare scheduling outcomes while retaining the timing, policy and fairness assumptions.
Separate waiting from service
A queue forms when a ready job cannot immediately obtain its required resource. Arrival time, service start and completion define two useful quantities: waiting time=start−arrival; total time in this system=completion−arrival. Service time fills the interval from start to completion in our simple non-preemptive model. Define whether a reported delay includes that service interval.
For a single first-come, first-served resource, a job starts at the later of its arrival and the previous job’s completion. Completion then equals start plus its service time. Resolve ties explicitly. This small recurrence lets us inspect an event record before relying on a complicated simulation. Real systems may also have setups, priorities, interruptions, deadlines and resource compatibility.
Variability and timing affect the experience
In the even case, arrivals at 0, 2, 4, 6 minutes each need 2 minutes of service. Starts equal arrivals and all waits are zero. In the paired case, arrivals are 0, 0, 4, 4. With job number breaking ties, starts remain 0, 2, 4, 6; waits become 0, 2, 0, 2. Mean waiting is 1 minute although the service blocks are identical.
Both finish all four jobs at 8 minutes. This finite example demonstrates that workload totals do not determine waiting. It is not a steady-state queue forecast, nor does it establish a general waiting-time formula from a few observations. Long-run stochastic analysis requires assumptions about arrivals, service, policy and stability; those assumptions should accompany its conclusions.
A schedule embodies an objective
Consider three jobs available at time zero, needing 6, 2 and 1 minutes. Serving them in that order yields completion times 6, 8, 9. Serving shortest first yields 1, 3, 9. The second sequence lowers the mean completion time in this constructed batch, while the six-minute job waits longer before starting. The final completion time stays 9 because the total work is unchanged.
Shortest-first is not a universal service rule. Urgency, deadlines, fairness, knowledge of durations and compatibility may change the objective. A continuing stream of short jobs could repeatedly postpone a long one under an unrestricted policy. State what is being optimised and inspect individual outcomes, rather than reporting a smaller average as if everyone necessarily benefits.
Calculate the two batch summaries
For order 6, 2, 1, mean completion time is(6+8+9)/3=7.67 minutes. For 1, 2, 6, it is(1+3+9)/3=4.33 minutes. All jobs arrived at zero, so completion time also equals total time in this batch system.
The long job completes at 6 minutes in the first sequence and 9 in the second. Its outcome worsens even though the mean improves. The comparison assumes no setup, no preemption and all three jobs ready initially; it does not resolve deadlines or how a continuing arrival stream should be managed.
Try the reasoning
Why do paired arrivals create waiting here?
Show the answer and reasoning
Two jobs need the same single resource at once. One must wait for the other’s 2-minute service.
Does the unchanged final completion imply unchanged customer experience?
Show the answer and reasoning
No. Waiting and individual completion times can change while the total batch work stays the same.
What should accompany a claimed scheduling improvement?
Show the answer and reasoning
The objective, resource and timing assumptions, policy, aggregate measures and the affected individual or class outcomes.
What to carry forward
Reconstruct the events and choose the objective explicitly; less average waiting can redistribute delay.
References
Teaching resources and research supporting this lesson’s explanations and examples.
- Queueing Systems: Lecture 3 · 18 October 2006Amedeo R. Odoni · MIT OpenCourseWareCourse notes · PDF
- Production Systems Engineering: Requirements Analysis for Discrete-Event Simulation · NISTIR 6154, April 1998 reportAnna Bartolotta, Charles McLean, Y. Tina Lee and Albert Jones · NISTTechnical report · PDF