GLOBAL KNOWLEDGE ARK

Engineering & Technology · Manufacturing Processes & Process Selection

Manufacturing process families and selection criteria

A design team needs twenty sensor brackets now and may later need a thousand. A workshop proposes cutting them from stock. Another supplier proposes dedicated shaping tools. The drawing is the same, but the sensible route can change with quantity, delivery time and evidence that each route can meet the requirement.

Material Structure & Properties and Engineering Design Methods & Trade-offs supply deformation, properties, requirements and trade-offs. This chapter recalls volume, stress and percentage arithmetic before using them. The last lesson introduces mean and standard deviation in context. All numerical prices, dimensions, shrinkage factors, times, yields, distributions and resource quantities are original teaching assumptions. They are not supplier data, machine settings, qualified procedures or allowable service values.

Back to the chapter

After reading, you can

Screen manufacturing routes against material, geometry, quality and production constraints before comparing cost.

01

Ask what happens to the material

A process family describes the main transformation. Casting gives shape to a liquid that becomes solid. Forming changes solid shape through permanent deformation. Machining removes material. Additive manufacturing builds material into a shape. Joining connects pieces; finishing changes a surface or condition. These labels help organise questions, but they are not complete production routes.

A bracket might start as cast stock, be rolled into plate, cut and drilled, joined to another piece and coated. Calling it “machined” identifies only part of that history. Write the starting form, major operations and resulting state in order. Include inspections and handling where they can determine whether the next step succeeds.

02

Use the requirements to reject unsuitable routes

Start with the intended material and service condition. Can the route process the chosen grade without losing needed properties? Then examine size, wall thickness, cavities, tool access, release from a mould, surface condition and dimensional tolerance. Tolerance is the permitted variation defined by the design; the process must supply evidence of what it can consistently achieve.

Next examine quantity, rate and flexibility. Dedicated tooling may spread an initial cost over many copies, while a route with modest setup may suit changing designs. Neither description makes a process universally cheaper. Tool life, labour, scrap, inspection, secondary operations and delivery risk can reverse a comparison. Capacity also matters: a low quoted price is of little use if the required quantity cannot arrive on time.

03

Compare feasible routes on the same basis

The figure uses two invented cost models for equally acceptable brackets. Route A costs €100 to set up and €8 per part. Route B costs €1000 to set up and €2 per part. These values teach the effect of quantity; they are not supplier prices or a claim about a named process.

For N parts, total model costs are CA = 100 + 8N and CB = 1000 + 2N. A setup is paid once in this model; a variable cost is paid for each part. If tool replacement or a second batch setup is required, add it explicitly. Compare the same delivered quantity and quality, with the same exclusions.

Two route cost models cross at 150 partsA linear total-cost plot for two invented equally acceptable routes, with a crossover at 150 parts and 1300 euros.Invented route costs change with order quantity0100020003000075150225300Parts in one modelled order, N€A: 100 + 8NB: 1000 + 2N150 parts; €1300Same assumed quality; tooling life, delivery and tax excluded.
Horizontal linear axis: 0–300 parts. Vertical linear axis: €0–€3000. Route A CA = 100 + 8N; route B CB = 1000 + 2N. Intersection at N = 150, cost €1300. At N = 0 the lines show setup cost, not a delivered order. Original teaching values; no real process price ranking.

Locate a quantity at which the preferred model changes

Equate the constructed costs: 100 + 8N = 1000 + 2N. Subtract 2N and 100 to obtain 6N = 900, so the crossover is N = 150 parts. Both totals are €1300 there.

At twenty parts, A totals €260 and B €1040. At one thousand, A totals €8100 and B €3000. The first order favours A within this cost model; the larger order favours B.

If B fails a necessary tolerance or has an unacceptable lead time, its cheaper thousand-part total cannot make it feasible. If the design may change before a thousand are needed, evaluate likely batches rather than pretending the forecast is a firm order.

Try the reasoning

  1. Why can a cheaper shaping operation still lead to a more expensive delivered part?

    Show the answer and reasoning

    Extra machining, rejected parts, tooling, inspection or handling may outweigh its saving. Compare complete feasible routes.

  2. What does the crossover of 150 parts establish?

    Show the answer and reasoning

    Equality of two invented linear cost models under their assumptions. It is not a universal production threshold.

  3. Why record the starting material form as well as the final process?

    Show the answer and reasoning

    Earlier shaping and treatment affect properties, availability and the work required later. A process name alone loses that history.

What to carry forward

Screen for feasible material, geometry and quality first; then compare complete production routes at the required quantity.

References

Teaching resources and research supporting this lesson’s explanations and examples.

  1. 2.008 Design and Manufacturing II — Spring 2025: lecture notesJung-Hoon Chun and Josh Ramos; MIT OpenCourseWareTeaching resourceocw.mit.eduRead source
  2. Manufacturing — OpenLearn, single-page courseThe Open UniversityTeaching resourceopen.eduRead source