Engineering & Technology · Process Balances, Flowsheets & Design

Equipment functions, utilities and process integration

Two flowsheets both close their material balances. One uses separate heating and cooling utilities; the other transfers heat between process streams. Comparing them requires understanding the equipment functions and the conditions under which that internal transfer can occur.

Use the earlier material, thermodynamics and fluid-engineering chapters for quantities, energy and flow. Ratios, elementary algebra, units and chemical amount are enough for the constructed calculations here.

Back to the chapter

After reading, you can

Connect equipment functions and utility demands to a flowsheet while checking what process integration can actually achieve.

01

Equipment performs a specified change

A pump supplies mechanical energy to a liquid stream; a compressor performs a pressure-raising function for a gas. Heat-exchange equipment transfers energy between streams, while a separator changes how material is distributed among outlets. A reactor provides conditions for chemical change. These functions can interact, so distinguish a unit’s intended role from every effect it has on the process.

A functional box does not establish a suitable equipment type, material, capacity or operating range. The process record must connect inlet and outlet conditions, required performance and constraints to further equipment analysis. For example, a separation target can change subsequent heat demand, and a pressure change can alter phase conditions. A consistent flowsheet keeps those dependencies visible.

02

Recoverable heat is an internal transfer

Suppose an original recipient stream requires 100 kW. Assume that 60 kW can feasibly transfer from another process stream at compatible temperatures and times. The remaining external hot-utility demand is 40 kW under the stated steady assumptions. A utility is a supporting energy or material service, such as heating, cooling or electrical power; its source and boundary still matter.

Across a boundary containing both process streams, their internal 60 kW transfer cancels: it leaves one included stream and enters the other. Do not count it as new energy created by integration or as two independent savings. The source’s cooling requirement and the recipient’s heating requirement change together; the overall account must include both.

A heat demand can combine an internal transfer and an external utilityOriginal heat-integration account: a recipient stream requires 100 kW. A supplied feasible internal heat transfer provides 60 kW; external hot utility provides the remaining 40 kW. Feasibility of the internal transfer is an assumption requiring temperature, timing and transfer checks.Original recipient duty · integration feasibility is suppliedRecovered: 60 kWUtility: 40 kWRecipient demand = 100 kWInternal heat transfer cancels in a combined two-stream boundary.Common scale: 5.6 SVG units/kW · no economic optimum implied
A 100 kW recipient duty is divided into 60 kW from a compatible process heat source and 40 kW from external utility. Segment widths 336 and 224 use one scale. This account assumes the internal transfer is achievable; source temperature, recipient temperature, timing, area, fouling and material compatibility need separate evidence.
03

Quantity alone does not establish recoverability

A hot stream’s available energy does not mean it can meet any colder stream’s entire demand. Temperature differences and profiles constrain transfer, and finite transfer coefficients and surface area affect achievable duty. Timing matters if one stream is intermittent. Material compatibility, fouling, pressure containment and contamination constraints can make a seemingly attractive connection unsuitable.

Integration also couples operation. Starting one unit may require a utility before a second stream becomes available; disturbances can propagate through shared heat exchange. Consider controllability, isolation for maintenance and the service required during changing conditions. A reduction in one steady utility account does not automatically establish lower total cost, lower life-cycle impact or adequate operation across the intended range.

04

A stronger source can supply less useful heat

Add time to the original recipient account. In this separate constructed case the recipient needs 100 kW continuously for two hours. The required service is therefore 100×2=200 kWh. Compare source S, which can supply 60 kW during the first hour only, with source T, which can supply 40 kW during both hours. Assume transfer at those rates is feasible at compatible temperatures while each source is available. There is no heat storage or heat pump, and external utility must supply the remaining demand at each instant.

With S, utility is 100−60=40 kW in hour one, but 100 kW in hour two. Its energy is 40×1+100×1=140 kWh. With T, utility is 60 kW throughout, giving 60×2=120 kWh. The smaller recovery rate supplies 80 kWh in total instead of 60. Comparing only the largest available kW number would choose the wrong source for reducing utility energy in this service window.

Now stipulate utility equipment able to deliver at most 80 kW. S leaves a 20 kW shortfall in the second hour: balancing 200 kWh over a period cannot move first-hour heat to that later hour without a storage process. T stays below the cap at 60 kW and meets the supplied time-by-time account. This is a conditional comparison, not evidence that an exchanger or utility actually meets those duties. The source/sink temperatures, transfer capability and actual schedules still need corresponding observations.

Original constant-rate intervals. Compatible heat transfer during availability is assumed; zero in the second S interval means the source is unavailable.
IntervalDemandRecovered with S / TUtility with S / T
0–1 h100 kW60 / 40 kW40 / 60 kW
1–2 h100 kW0 / 40 kW100 / 60 kW
Two-hour energy200 kWh60 / 80 kWh140 / 120 kWh
Recovery timing and utility capacityTwo same-time-scale panels compare an intermittent 60 kW recovery source S with continuous 40 kW source T. Their utility needs differ despite the higher S peak.Usable heat must coincide with the demandOriginal two-hour service: recipient needs 100 kW continuously; no heat storage.0406010001204060100012Recovered power (kW)S: 60 kWfirst hour onlyT: 40 kWboth hoursRequired utility (kW)80 kW capS: 40 then 100T: 60 then 60Time from service start (h), same scale in both panelsS requires 140 kWh utility; T requires 120 kWh. The cap tests power, not energy.
All values constructed. Demand 100 kW for 2 h gives 200 kWh. S recovers 60 kW for hour 0–1 and 0 for 1–2, so utility 40 then 100 kW totals 140 kWh and exceeds an 80 kW utility cap in the second hour. T recovers 40 kW throughout, so utility 60 kW totals 120 kWh and stays within the cap. Compatible transfer during source availability is supplied; no storage, heat pump or real equipment qualification is modelled.

Distinguish a balance from a feasible design

The recipient account is 60+40=100 kW. If a compatible internal source could supply only 45 kW instead, external hot utility would become 55 kW under unchanged assumptions. This arithmetic is an account conditional on achievable transfer, not a method for deciding that the proposed exchanger can deliver either figure.

To compare the alternatives, retain the recipient target, source and sink temperature profiles, timing assumptions and evidence behind the estimated internal duty. Then compare additional equipment, utility consumption, maintenance, control and life-cycle effects on an equal-service basis. The simplified bar diagram encodes the supplied duty split; it does not present equipment dimensions or an optimum network.

For the added schedule comparison, check both energy closure and peak power. S gives 60+140=200 kWh over the window but fails the 80 kW utility cap during hour two. T gives 80+120=200 kWh and needs only 60 kW utility. A missing source interval is a physical dependency, not a discrepancy that can be repaired by averaging the two hourly powers.

Try the reasoning

  1. Why does internal heat transfer cancel across a boundary containing both streams?

    Show the answer and reasoning

    The same energy leaves one included stream and enters another, so it is not an external input to the combined system.

  2. If only 45 kW of the 100 kW demand is recoverable, what utility remains?

    Show the answer and reasoning

    55 kW, assuming the required duty and all other conditions stay unchanged.

  3. Does an available heat quantity prove that a proposed transfer is achievable?

    Show the answer and reasoning

    No. Temperature profiles, transfer capability, timing and equipment constraints also need evidence.

  4. Suppose T is available for only the first 1.5 h, with all other assumptions unchanged. Compare its utility energy with S and decide whether an 80 kW utility can serve the whole window.

    Show the answer and reasoning

    T supplies 40×1.5=60 kWh. Utility is 60 kW for 1.5 h and 100 kW for 0.5 h, totalling 90+50=140 kWh: equal to S’s energy. Both nevertheless fail the 80 kW utility cap when their recovery source is unavailable. Equal total energy does not establish the same schedule or time-by-time feasibility; another supported source, storage or changed service would require a new account.

What to carry forward

Connect equipment functions and internal transfers to a complete account, then establish feasibility and operating consequences separately.

References

Teaching resources and research supporting this lesson’s explanations and examples.

  1. NPTEL, IIT course Chemical Technology2 sources
    1. Module1 Lecture1, Orientation §1.2NPTEL, IIT course Chemical TechnologyReference guidearchive.nptel.ac.inRead source
    2. Module1 Lecture1, Orientation §1.5NPTEL, IIT course Chemical TechnologyReference guidearchive.nptel.ac.inRead source
  2. Waste Heat Recovery: Technology and Opportunities in U.S. Industry (2008), §§2.2–2.3BCS Incorporated, prepared for U.S. Department of EnergyReference guide · PDFwww1.eere.energy.govRead source